MALACAÑAN PALACE
MANILA

BY THE PRESIDENT OF THE PHILIPPINES

[ Proclamation No. 1086, June 25, 1998 ]

RESERVING FOR SCHOOL SITE PURPOSES OF THE TAMBULIG NATIONAL HIGH SCHOOL A CERTAIN PARCEL OF LAND OF THE PUBLIC DOMAIN SITUATED IN THE MUNICIPALITY OF TAMBULIG, PROVINCE OF ZAMBOANGA DEL SUR, ISLAND OF MINDANAO

Upon recommendation of the Secretary of Environment and Natural Resources and by virtue of the powers vested in me by law, I, FIDEL V. RAMOS, President of the Philippines, do hereby withdraw from sale, entry, disposition and settlement, and reserve for school site purposes of the Tambulig National High School, subject to private rights, if any there be, a certain parcel of land of the public domain situated in the Municipality of Tambulig, Province of Zamboanga del Sur, Island of Mindanao, which parcel of land is more particularly described as follows:

LOT 121, CSD-09-05-000622

A Parcel of Land, (Lot 121 of the subdivision plan, Csd-09-05-000622, being a portion of Lot 8164, Pls-61), situated in the Barrio of Lower Udiong, Municipality of Tambulig, Province of Zamboanga del Sur. Bounded on the NE., along line 15-16 by Lot 14; along line 16-17 by Lot 15; along line 17-18 by Lot 16; along line 19-20 by Lot 18; along line 20-21 by Lot 19; along line 21-22 along line 20; on the SE., along line 22-23 by Lot 22; along line 23-24 by Lot 23; along line 24-25 by Lot 24; along line 25-26 by Lot 25; along line 26-27 by Lot 26; along line 27-28 by Lot 27; along line 28-29 by Lot 28; along line 29-30 by Lot 29; along line 30-31 by Lot 30; along line 31-32 by Lot 31; along line 32-33 by Lot 122 (Communal Irrigation); along line 33-34 by Lot 105; along line 34-1 by Lot 120; on the SW., along line 1-2 by Lot 128; (Road widening National Highway); on the NW., along line 2-3 by Lot 1; along line 3-4 by Lot 2; along line 4-5 by Lot 3; along line 5-6 by Lot 4; along line 6-7 by Lot 5; along line 7-8 by Lot 6; along line 8-9 by Lot 7; along line 9-10 by Lot 8; along line 10-11 by Lot 9; along line 11-12 by Lot 10; along line 12-13 by Lot 11; along line 13-14 by Lot 12; along line 14-15 by Lot 13; all of the subdivision plan Csd-09-05-000622. Beginning at a point marked “1” on plan being N. 87° 19" E., 2716.79 m. from BLIM No. 28, Pls-61, Aurora Public Lands Subdivision, thence:

N. 61° 37" W., 56.56 m. to point 2;
N. 30° 37" E., 9.82 m. to point 3;
N. 30° 23" E., 10.14 m. to point 4;
N. 30° 46" E., 9.75 m. to point 5;
N. 30° 23" E., 9.87 m. to point 6;
N. 30° 18" E., 9.75 m. to point 7;
N. 30° 19" E., 10.10 m. to point 8;
N. 30° 26" E., 9.93 m. to point 9;
N. 30° 34" E., 10.01 m. to point 10;
N. 30° 17" E., 10.07 m. to point 11;
N. 30° 39" E., 9.90 m. to point 12;
N. 30° 03" E., 10.44 m. to point 13;
N. 30° 37" E., 9.48 m. to point 14;
N. 30° 23" E., 8.54 m. to point 15;
S. 62° 09" E., 9.18 m. to point 16;
S. 61° 47" E., 10.13 m. to point 17;
S. 62° 17" E., 10.06 m. to point 18;
S. 62° 52" E., 9.93 m. to point 19;
S. 62°44" E. , 9.91 m. to point 20;
S. 63° 05" E., 10.02 m. to point 21;
S. 62° 03" E., 10.18 m. to point 22;
S. 29° 01" W., 7.96 m. to point 23;
S. 30° 10" W., 9.83 m. to point 24;
S. 29° 49" W., 9.94 m. to point 25;
S. 30° 38" W., 10.06 m. to point 26;
S. 29° 41" W., 9.77 m. to point 27;
S. 30° 00" W., 10.00 m. to point 28;
S. 30° 15" W., 10.00 m. to point 29;
S. 29° 17" W., 10.00 m. to point 30;
S. 29° 55" W., 9.48 m. to point 31;
S. 29° 33" W., 10.30 m. to point 32;
S. 30° 09" W., 4.80 m. to point 33;
S. 28° 49" W., 9.92 m. to point 34;
S. 69° 49" W., 22.27 m. to point of;

beginning, containing an area of EIGHT THOUSAND EIGHT HUNDRED FIFTY SIX (8,856) SQUARE METERS, more or less. All points referred to are indicated on the plan and are marked on the ground by P.S. Cyl. Conc. Mons. 15 x 60 cms. Bearings true. Date of original survey September 1936-February 1942 and that of the subdivision survey executed by Geodetic Engineer Cristino M. Magadan on February 20, 1975 to March 15, 1975, approved on July 18, 1980.1aшphi1

IN WITNESS WHEREOF, I have hereunto set my hand and caused the seal of the Republic of the Philippines to be affixed.

DONE in the City of Manila, this 25th day of June, in the year of Our Lord, nineteen hundred and ninety-eight.

(Sgd.) FIDEL V. RAMOS
President of the Philippines

By the President:

(Sgd.) LUIS C. LIWANAG II
Acting Executive Secretary


The Lawphil Project - Arellano Law Foundation